Bridge design in accordance with GMP guidelines

Assignment
In a production plant for pharmaceutical products subject to EU GMP conditions, a mobile bridge construction over a conveying path is required as part of the fire protection concept. The purpose of this bridge is to ensure that the nearest escape door can be reached and ensure compliance with the escape routes. The bridge construction must be made from non-flammable, clean-room-compliant materials and be non-slip for occupational safety reasons. In addition, the bridge must be able to withstand a load of at least 300 kg and must not affect the transportation of products beneath it.

mk solution
Bridge construction consisting of staircase and guardrail elements with Series 40 closed cleanroom profiles. The bridge is designed with low particle content so as not to compromise the requirements of the EU GMP guideline for cleanroom class D. The use of mk stair profiles and chequer sheet on the platform ensures that the stepping surfaces are non-slip. The bridge can be removed for cleaning and maintenance work on the bridge and the conveying path below. All surfaces are resistant to common cleaning agents. The design was carried out in accordance with the regulations of the occupational health and safety directive (traffic routes).

Benefits for customers

  • Designed in accordance with EU GMP guidelines
  • Mobile and flexible design
  • Modular design allows for easy assembly and disassembly

 

Products

Aluminum profile series 40
> Stairs & platforms