Aluminium Profile Structures under Various Operating Conditions

Interlinking for canister transport with a bridge 01

Problem definition
Two machining stations in a plastic canister production process need to be interlinked. The solution has to cope with inconvenient spatial constraints: Empty canisters need to be conveyed along a curve and past another machine so that they can be brought back to the original feed...

Discover more
Staubschutzhaube 01

Problem definition
A hood for extracting dust particles is required for the production of laboratory equipment. The contour as well as the inputs and outputs are specified by the customer. The hood must be equipped with a suction nozzle for an extraction system provided by the customer. It must also...

Discover more
Schutzkabine 01

Problem definition
A protective device guard built according to a customer-supplied drawing is required for the packaging area of a toothbrush production operation. The toothbrushes are already in their primary packaging, so there are no sanitary requirements. The protective device guard is located...

Discover more
System line for rhizotron screening 02

Problem definition
Planning, design, and construction of an automated system line for rhizotron screening (researching the root growth of plants). The rhizotron packages should be capable of being pivoted automatically and being removed individually for recurring photography in a darkened housing....

Discover more
Mobile test bench with storage system in a maritime container 05

Problem definition
To feed and discharge containers from a multi-level storage system, the containers need to be raised to the various storage levels and then lowered again by a parallel storage line. The available space is very limited. The machine should be as reliable and require as little...

Discover more
Profile rack for water treatment system 01

Problem definition
Flexible lightweight frame for a salt-water treatment system that is characterized by a long service life. The system is completely assembled in Germany and subsequently dismantled, in order to then be ultimately commissioned at the implementation site. Consequently fast...

Discover more