An automobile manufacturer wants to optimise the picking of orders in the manual spare parts warehouse. Therefore, a material trolley is required that is very compact and can hold up to 5 transport boxes.
A manufacturer of office supplies is looking to retrofit its outdated production line for cardboard folders. It wants to completely overhaul the system – in terms of both technology and appearance.
Electronic components to be used in the production of converter modules in ultrasonics need to be staged at a manual assembly station. The required components are held in the customer’s own pallets, which are to be removed and returned manually in the staging area.
An automotive supplier requires frames in order to perform comprehensive pressure, heat and emission tests on fuel tanks and for storing these tanks. The frames are to be used to install the tanks just like in an actual vehicle. The aim is to simulate the installation situation as realistically as…
A manufacturer of medical tests is building a machine for producing rapid coronavirus antibody tests. The machine can produce 40 tests per minute. For this purpose, the customer requires a pallet circulation system on which the tests can be assembled by robots fully automatically.
Problem definition
A car manufacturer wants to optimise the recycling process in the outfeed of a sheet metal punch press. Aluminium scrap parts must be separated from steel scrap parts and sorted by type. The sheet metal parts should be transported on a belt conveyor with a cut-resistant belt and…
Problem definition
An automated transport system is used in a laboratory environment to transport drawers to various positions in a cabinet incubator as well as to a position for manual loading and unloading. There is also an option for a visual assessment (qualitative assessment of the objects). A…
Problem definition
A foil wrapping machine for manufacturing delivery note pockets with glued-on hook-and-loop fasteners is to be fully retrofitted and renovated. The machine processes 80 m of foil or silicone paper fully automatically to produce 1,000 delivery note pockets per minute. The system’s…
Problem definition
A medical laboratory requires base cabinets for automatic measuring devices and automatic pipettes. The cabinets must be able withstand particular conditions, such as resistance to laboratory cleaning agents and vibrations from the devices placed on them. In addition, it must be…
Assignment
The client requires a fully-automated assembly line that will assemble, test, label and store multi-component sanitary fittings. The product comprises a total of 14 separate plastic parts, which have high manufacturing tolerances. In addition to this, both the plant and the control system…


![[Translate to English:]](/fileadmin/_processed_/f/7/csm_kanban-bereitstellung_05_1559d284ea.jpg)






