Practical examples for material supply & interlinking

Production line for titanium screws 02

Problem definition
In the production of titanium screws, baskets for holding the screws need to be conveyed from five lathes to the next transfer location. The conveying path needs to be adapted to the given spatial constraints. The lathes have a cycle time of 30 minutes per basket. During this…

Discover more
Production line for titanium screws 01

Problem definition
An interlink is required for a production process in the manufacture of titanium screws. Five lathes need to be interlinked with two thread whirling machines. Different screw types need to be processed. The lathes have a different cycle time than the thread whirling machines. The…

Discover more
Belt Conveyor for Granules 01

Problem definition
Unpackaged granules need to be transported in a food production application. The conveyor technology needs to provide constant transport in a straight line; there are no requirements regarding the position or orientation of the product being conveyed. The system is part of the…

Discover more
Interlinking for canister transport with a bridge 01

Problem definition
Two machining stations in a plastic canister production process need to be interlinked. The solution has to cope with inconvenient spatial constraints: Empty canisters need to be conveyed along a curve and past another machine so that they can be brought back to the original feed…

Discover more
Vakuumförderer für Vliesstreifen 01

Problem definition
For an application in the production of non-woven strips, cut sections of non-woven fabric need to be transported from one machining station to the next. The material is very thin and light. The system needs to run at a high speed of 140 m/min. The strips must be transferred from…

Discover more
Schutzkabine 01

Problem definition
A protective device guard built according to a customer-supplied drawing is required for the packaging area of a toothbrush production operation. The toothbrushes are already in their primary packaging, so there are no sanitary requirements. The protective device guard is located…

Discover more
Staufähige Verkettung Kurbelwelle 01

Problem definition
Interlinking of multiple workstations with different cycle or changeover times using cost-effective and dynamic feeding, buffering, positioning and separating of workpiece carriers.

mk Solution
The SPU 2040 accumulating pallet recirculation system allows for acyclic operation…

Discover more
Logistikablauf für Konsumgüter 01

Problem definition
The customer sought to simulate the entire logistics process for consumer goods for use in a training centre. Using beverage crates as an example, the customer wanted to display all the various stations, from manufacture of the goods, to transport and storage, all the way to the…

Discover more
Removal of Pressed Sheet Metal Parts 01

Problem definition
During the machining of sheet metal parts for home appliances, sheets are pressed to shape. The pressed sheets are transported away from the press. A worker removes the sheets and places them in a transport box for further processing. Previously the worker had to remove each sheet…

Discover more
Cycling Chain Conveyor with Immersion Bath 01

Problem definition
An automated cleaning station with an immersion bath is required in an assembly line for metal spindles. The spindles are loaded onto the conveyor by a customer-provided handling system and then transported into the cleaning solution, where they are rinsed. Any fluid and dirt…

Discover more