Reliable Guiding, Positioning and Adjusting with mk Linear Technology

Interlink for the production of cast parts 01

Problem definition

Two machining stations in a production process for cast parts need to be interlinked. The upstream and downstream machines have different cycle times. The interlink needs to restore the system’s autonomy. Two different types are produced on the line simultaneously. They are…

Discover more
Production line for titanium screws 03

Problem definition
In the production of titanium screws, a handling solution needs to lift the baskets containing the screws from the main conveyor life to the buffer conveyor or tip the containers into a funnel. The solution needs to process different screw types in no particular order and be able…

Discover more
Production line for titanium screws 04

Problem definition
During the production of titanium screws, the screws are expelled from the lathes and fill baskets made from perforated VA steel sheets. The screws that fall into the basket need to be counted. A lifting unit is also needed to transport the baskets to the main conveyor line at a…

Discover more
Production line for titanium screws 01

Problem definition
An interlink is required for a production process in the manufacture of titanium screws. Five lathes need to be interlinked with two thread whirling machines. Different screw types need to be processed. The lathes have a different cycle time than the thread whirling machines. The…

Discover more
Logistikablauf für Konsumgüter 01

Problem definition
The customer sought to simulate the entire logistics process for consumer goods for use in a training centre. Using beverage crates as an example, the customer wanted to display all the various stations, from manufacture of the goods, to transport and storage, all the way to the…

Discover more
Lifts for Packaged Food Products 01

Problem definition

Stacked pallets in a food production application need to be lifted so that they can be buffered on multiple levels. Pallet stacks weighing 50 kg each need to be transported. The stroke length is approximately 3300 mm. The machine needs to lift and lower but also convey in order…

Discover more
Flexible interlinking using flat top chain conveyors 01

Problem definition
In a production system for industrial filters, multiple, separate machining stations need to be interlinked. The interlinks should be as compact as possible. Products of different sizes need to be processed with minimal retooling times. The machine tools should also be able to…

Discover more

Problem definition
In an application for producing plastic fuel tanks, the blow-moulded tanks need to be fed into a multi-level storage system, where they are allowed to cool. The cycle must take a certain amount of time so that the tanks have sufficient time to cool. The tanks also need to be…

Discover more
Wood saw with linear module 01

Problem definition
A feed unit is to be used to push wooden beams into a saw and automatically cut them to custom-made size. A linear module is used to generate variable cutting lengths based on predetermined values provided by the control system. The cycle time for sawing the length of one beam is…

Discover more
Three-Axis Handling with Heavy-Duty Roller Conveyor 01

Problem definition
The customer required a palletiser with a connected tray recirculation system: Pallet trucks are used to feed Euro pallets loaded with trays into the system and then remove them again at the end of the process. The palletiser destacks filled trays from the pallets and feeds them…

Discover more